S17 BUS STATION

PROJECT SCOPE 2026 UPDATE

LOD 500 AS BUILT DRAWINGS UPDATE

  • Review & Auditing of exiting LOD 500 as built drawings as per project deliverables
  • Identifying drawing discrepancies and addition of missing dimensions and tags
  • Update floor plans reflected ceiling plans (RCPs), facades, and cross-sections
  • Ensure proper layering, annotation, and dimensioning in compliance with project CAD/BIM standards
  • Label all structural, architectural, and MEP components, including piping, and HVAC systems
  • Apply appropriate line weights, symbols, and scale adjustments to enhance drawing readability.
  • Conduct a drawing-to-model comparison to confirm that extracted drawings align with the verified BIM model
  • Validate key dimensions, levels, and annotations against as-built laser scan data.
  • Apply title blocks, revision history, and project metadata as per PWA standards.
  • Ensure proper file formatting for AutoCAD (DWG), PDF, and BIM-compatible deliverables.